Community Councils Together on Trams/Trams Team meeting, 25 June 2020

Minutes of the Community Councils Together on Trams/Trams Team meeting
(Construction Phase) via Google Meet on Thursday 25 June 2020 at 5:30pm Continue reading

LHNCC planning update June 2020

LHNCC’s notes on the following planning matters have just been updated. See the bold items on the following pages:

Trams: shut-down plans overview (27 March)

(from the Trams to Newhaven newsletter dated 27 March)

Construction on Edinburgh’s Trams to Newhaven project will stop this week to protect the safety of workers and residents during the current Coronavirus outbreak.

The Council’s decision to instruct contractors Morrison Utility Services (MUS) and Sacyr Farrans Neopul (SFN) to cease site works follows advice from Scotland’s First Minister that all construction sites should close, unless the project being delivered is essential, such as a hospital.

SFN and MUS will make sites on Leith Walk, Constitution Street, Lindsay Road and Ocean Drive safe and secure by the end of the week before shutting down. There will be contractors on site as necessary for safety and security checks.

Emergency services have access to all sites at all times should they require it.

Work will continue off-site where this can be done remotely,  including design, planning and scheduling, as well as drawing up a remobilisation strategy for returning to the site once restrictions are lifted. The project team will also be closely liaising with MUS and SFN to look at ways of mitigating the impact of work stopping on the wider project.

LHNCC February 2020 minutes

Minutes of the Leith Harbour and Newhaven Community Council meeting, held at the Leith Community Education Centre on Tuesday 25 February 2020 at 7pm Continue reading

Community Councils Together on Trams/Trams Team meeting, 27 February 2020

Minutes of the Community Councils Together on Trams/Trams Team meeting (No 2 Construction Phase) at 165 Leith Walk on Thursday 27 February at 5:30pm Continue reading

LHNCC January 2020 minutes

Minutes of the Leith Harbour and Newhaven Community Council meeting, held at the Leith Community Education Centre on Tuesday 28 January 2020 at 7pm Continue reading

Community Councils Together on Trams/Trams Team meeting, 30 January 2020

Minutes of the Community Councils Together on Trams/Trams Team meeting (No 1 Construction Phase), at 200 Bonnington Rd, on Thursday 30 January at 5:30pm Continue reading

Notification of start of construction work (Lindsay Road and Ocean Drive)

(copied from a letter from Trams to Newhaven)

Date 10 February 2020

Dear Sir/Madam,

Notification of start of construction work

Construction works to take trams to Newhaven will commence from Newhaven to Melrose Drive on 6 March 2020 and are scheduled to be completed by Summer 2021. Pedestrian access will be maintained at all times. All parking and loading on Lindsay Road, Melrose Drive and North Leith Sands will be suspended.

Works will also commence on Ocean Drive, at the front of Ocean Terminal, on 13 March 2020, scheduled to be completed by Autumn 2020. Pedestrian access will be maintained at all times. All parking and loading on Ocean Drive and Ocean Way will be suspended. Please note that Ocean Terminal will remain open as usual and access to the car parks will be maintained.

The full construction programme can be viewed on the project website – www.tramstonewhaven.co.uk.

Construction Works
Fencing will be erected in order to establish the construction site which will take approximately two weeks. During this period there will also be further site investigation works undertaken.

Information boards and directional signage will be displayed once the fencing has been erected and the construction site has been established.

Following site set up, Sacyr, Farrans, Neopul (SFN), and Morrison Utility Services (MUS) roles will involve excavation of the road to allow utility diversions, tracklaying, installation of tram infrastructure, public realm improvements, and heritage and archaeology works.

Construction site working hours are Monday to Friday 7am to 7pm and Saturday 8am to 1pm.

Ail works will be undertaken in line with the Code of Construction Practice which details, amongst other things, acceptable levels of noise and vibration. The Code of Construction Practice can be found on the project website – www.tramstonewhaven.co.uk.

Lothian Buses
There will be diversions to your bus services during construction. Full details will be available at www.lothianbuses.com and via the Transport for Edinburgh App.

Bins
There will be no changes to your bin collection arrangements.

Other Works
Other associated work will also be taking place at the following locations:

  1. Foot of the Walk to Coatfield Lane — works are continuing and scheduled to be completed by Spring 2021.
  2. Queen Charlotte Street to Constitution Place — works are continuing and scheduled to be completed by Autumn 2020.
  3. Leith Walk — enabling works are continuing and main construction works will commence 28 March 2020 scheduled to be completed by Summer 2021.

Traffic Management
Traffic management arrangements have been approved jointly with members of the city’s Traffic Management Review Panel, including Lothian Buses and the emergency services, and these will be in place from 6 March 2020 for Newhaven to Melrose Drive and 13 March 2020 for Ocean Drive. Access through the site will be maintained for emergency services at all times. Diversion routes and advanced warning signage will be erected in the vicinity for information and detailed drawings for these can be found on the Trams to Newhaven website.

The project will assess the traffic management arrangement throughout the construction period and make amends where required.

Newsletter
To keep up to date with the project’s progress and news, sign up to our mailing list at www.tramstonewhaven.co.uk.

Considerate Contractor Scheme
SFN and MUS both follow the principles of the Considerate Constructors Scheme, which requires a firm focus on outstanding management, efficiency, awareness of local environmental issues, and a genuine consideration for neighbours and the community.

During the time that the above works are being undertaken, all efforts will be made to minimise disruption and inconvenience to residents and businesses. Further details can be found at
https://www.ccscheme.org.uk/

For further information please visit www.tramstonewhaven.co.uk. Alternatively, you can contact us via email at Newhaven.tram@edinburgh.gov.uk or by phone on 0131 322 1122.

Yours faithfully

Trams to Newhaven Team

LHNCC minutes August 2019

Minutes of the Leith Harbour and Newhaven Community Council meeting, held at the Leith Community Education Centre on Tuesday 27 August 2019 at 6:30pm

Actions and decisions are red italic. Nem con means that no-one spoke or voted against an item.

Continue reading

Preparatory works for Trams to Newhaven continue with vibration testing

(adapted from an email from Trams to Newhaven: view the original at https://mailchi.mp/7f4d38afd7a4/trams-to-newhaven-update-february-2019-final-business-case-233657)

Ground and Site Investigation Works update

Ground and site investigation works along the route are now in the final stages, with the last of the scheduled works due to complete in week commencing 22 July 2019.
The essential pre-enabling works, being carried out by the tram project’s Systems and Infrastructure contractor Sacyr, Farrans, Neopul (SFN), involves SFN carrying out detailed ground investigation surveys at 25 sites on the route. The work is being carried out in sections of approximately 100 metres at a time and under localised lane closures.
The purpose of ground investigation works is to determine the ground conditions along the route so that the project’s final design can be confirmed. SFN have been checking, among other things, the depth of the bedrock. This will allow us to better understand how deep tram infrastructure foundations need to be, as well as the dimensions of the ‘track slab’, which will be laid beneath the tram tracks.

Continue reading