Click the graphics to see the original PDF
![]() |
![]() |
Following on from this post, Edinburgh Council has just sent the following detail about the road resurfacing planned for this summer.
| Location | Planned Start Date | Estimated Duration | Work Detail |
| Broughton Street | 28-May + 22 Aug | 4 weeks + 2 weeks | Pedestrian crossing upgrade + carriageway resurfacing |
| Albany Street | 03-Jun | 1 week | Carriageway resurfacing |
| Hopetoun Street | 07-Jun | 2 days | Carriageway resurfacing |
| Academy Street | 11-Jun | 1 week | Overlay setts |
| Dalmeny Street | 17-Jun | 10 days | Carriageway resurfacing, overlay setts and minor footway works |
| East Hermitage Place | 26-Jun | 3 days | Carriageway resurfacing |
| Portland Place | 28-Jun | 1 week | Carriageway resurfacing |
| McDonald Road | 01-Jul | 10 days | Footway widening and carriageway patching |
| Easter Road/Duke Street | 01-Jul | 8 weeks | Junction redesign |
| East London Street | 02-Jul | 7 weeks | Pedestrian crossing upgrade and carriageway resurfacing |
| Duncan Place | 10-Jul | 2 weeks | Carriageway resurfacing and minor footway works |
| Great Junction Street | 10-Jul | 1 week | Carriageway resurfacing |
| Gordon Street | 02-Aug | 1 week | Carriageway resurfacing |
| Bonnington Road | 08-Aug | 3 weeks | Carriageway resurfacing |
| Ocean Drive | 08-Aug | 3 days | Carriageway resurfacing |
| North Leith Sands | 13-Aug | 1 week | Carriageway resurfacing and minor footway works |
| Newhaven Road | 26-Aug | 2 weeks | Carriageway resurfacing |
| Annandale Street | 29-Aug | 7 weeks | New pedestrian crossings and carriageway resurfacing |
| Broughton Road | 05-Sep | 2 weeks | Carriageway resurfacing |
| Easter Road | 11-Sep | 3 weeks | Carriageway resurfacing and minor footway works |
| Links Place | 23-Sep | 4 weeks | Carriageway resurfacing, new traffic island and footway works |
| Pilrig Street | 29-Sep | 4 weeks | Carriageway resurfacing, new traffic island and footway works |
(adapted from a communication from Save Leith Walk)
Save Leith Walk would like to invite you to a Community Assembly to discuss how you would like Leith run. This event will be a great opportunity to meet fellow Leithers and share what you value in your community and what you would like to improve. Together we can build momentum to take action in shaping our neighbourhood and take ownership.
Please book your place via Eventbrite.
The Electoral Reform Society will facilitate the event and help with bringing aspirations together. The information gathered on the day will be used to create an Action Plan for the local community, enabling the people of Leith to take a pro-active role in the development of their community. There will be plenty of time for discussion, networking and sharing of ideas.
They will also be joined by speakers from Living Rent and Planning Democracy.
LHNCC Meeting, Shore Room, Leith Community Education Centre, Newkirkgate
Tuesday 28 May 2019 at 6.30pm
(also available on LHNCC planning page)
Affordable Block
Next meeting 29 May, Contractor to be in attendance
Updates available on LHNCC ‘other work’ page
Introducing Newhaven Walks: stand at Volunteering Event at Leith Community Centre and at other events to raise profile
Feedback
Detail available on LHNCC events page
Starting to establish Neighbourhood Networks, Thursday 30 May, 6.00pm-8.00pm. Venue tbc.
· Closes 3 June 2019
https://consult.gov.scot/better-homes-division/energy-efficient/
Closes 17 June 2019
https://consult.gov.scot/housing-services-policy-unit/short-term-lets
Closes 19 July 2019
Tuesday 25 June 2019
(adapted from a communication from Heart of Newhaven)
Join a walk, mainly flat terrain but with some cobbles, through the area with experienced, professional tourist guide Mary Kemp Clarke.
Founded in the 15th century, the village has grown organically around its harbour and encompasses a wealth of fascinating historical and archaeological detail and social history.
![]() |
![]() |
Walks: June 6th & 28th and August 7th & 9th.
Time: 2.00pm – 3.30pm (approx.)
Start: Meet Mary at The Harbour at 2.00 p.m. (She is a fully trained and qualified Blue Badge Tourist Guide accredited by the Scottish Tourist Guides Association since 1999, and has the confidence, experience and energy to show visitors from diverse backgrounds around the whole of Scotland, not just Newhaven! She’s also fluent in Spanish).
To book in advance: email admin@heartofnewhaven.co.uk(with Newhaven Walk in the title line)
Learn about links with the Canadian Goldrush and the Spanish Armada; the early days of photography; shipbuilding and fishing, as you pass the old fish market and the lighthouse; the oldest working publicVictorian school in Edinburgh; the last of the tenements and fishermen’s cottages.
Find out how the The Heart of Newhavencommunity initiative is working hard to save the old Victorian Primary School building when its pupils move on to a brand new school by purchasing the old school building and giving it a new lease of life as a community hub containing a Newhaven and Victorian Education museum as well asversatile spaces for inter-generational community use.
Visit our website: heartofnewhaven.co.uk
(From Save Leith Walk and the Electoral Reform Society)
Click the graphic to see the original PDF.
Noted: ECI is underway, but not all senior contractor staff are in Edinburgh. ECI will end 9 October 2019. Lane closures with heras and barrier will commence from 10 October 2019. To confirm the track slab design the contractor will carry out ground and site investigation along the route[note i]. This will be carried out via trail holes and bores. These works will be carried out under minor traffic management lasting on average 5 days per location.
(adapted from an email from Edinburgh Council)
The carriageway on a number of streets in your Ward are due to be resurfaced during the Summer of 2019. The roads affected have been prioritised because of their current condition and because the upcoming tram works will prevent any planned resurfacing work from taking place in and around the proposed tram line during the construction period.
The resurfacing works are planned to start on 27 May and will be carried out during weekdays in separate phases in order to minimise disruption to the public. On some traffic sensitive routes, work may be carried out under nightshift to minimise the impact on traffic. Most roads affected will be fully or significantly resurfaced with a select few being only partially resurfaced or patched as required. There will also be some improvements to pedestrian facilities, traffic signal upgrades and renewal of some street furniture.
(This post is the minutes of the EBUG inaugural meeting on 2 May 2019, except names of EBUG members and attendees have been omitted because LHNCC does not have permission to share such personal details.
The minutes are followed by EBUG’s ‘Outline statement’.
EBUG can be contacted via edinburghbususersgroup@btinternet.com)